Fuel Up

Charge your electric fleet without waiting for the grid.

Megawatt-scale power and chargers deployed at your depot in 30 days. Fully managed. No CAPEX. Drivers arrive to charged vehicles every shift.

The grid is the bottleneck.

  • • 5 to 15 years for utilities to deliver new industrial capacity
  • • $200 to $1,000 per kW for new high-power interconnections
  • • Demand charges, congestion fees, and tariffs stacking on every bill
  • • Reliability declining as load grows faster than transmission
  • • Depots cannot energize chargers fast enough to keep up with electrification

What we deploy instead.

  • • Megawatt-scale generation and storage shipped to your depot
  • • Professional on-site installation by our team
  • • 24/7 remote monitoring with on-site service when needed
  • • Capacity that scales as you add vehicles, not five years later
  • • Standalone operation or supplement to your existing grid connection

What you get with every deployment.

Industrial energy at fleet scale, with none of the grid tradeoffs.

Energized in 30 days

Contract to full power in under a month. No interconnection study, no utility queue.

99.99% uptime target

Real-time monitored, replaceable systems. Faults are caught and serviced before drivers notice.

No interconnection CAPEX

Simple monthly billing competitive with grid kWh. No tariffs, demand charges, or congestion fees.

Scales with your fleet

Add capacity in days when you add vehicles. Modular generation and storage, upgraded on request.

AI-scheduled charge windows.

The AI Fleet Manager pulls telematics from every vehicle and books each charge window around its route. Vehicles are topped up before the next shift, never sitting on a plug they no longer need.

No driver waiting at a public charger. No depot scramble at 5am. Each session is logged per-VIN and rolls into your energy reporting.

See the AI Fleet Manager →
Sample charge schedule
FU-3104 · eTransit cargoReady by 5:00am
FU-3217 · F-150 LightningReady by 6:30am
FU-3088 · Sprinter EVReady by 7:00am
FU-3142 · eM2 box truckReady by 8:15am

EV charging FAQs.

How fast can you energize chargers?

Contract to energized in under 30 days. We bring the power to you. No interconnection study, no utility wait, no multi-year permit cycle.

Do I have to pay for the equipment upfront?

No. We own, install, and maintain the system. You pay a simple monthly rate competitive with grid power per kWh, with no interconnection CAPEX, demand charges, or congestion fees.

Will it work alongside my existing utility power?

Yes. The system can run standalone or supplement an existing grid connection during peak demand, so you avoid demand charges without giving up your utility tie.

What happens if a unit fails?

Real-time monitoring catches faults before drivers do. Failed components are replaced on-site by our technicians. Target uptime is 99.99 to 99.999 percent.

Can capacity grow with my fleet?

Yes. The system is modular. Add generation or storage in days when you add vehicles, instead of waiting five years for a utility upgrade.

What metros do you serve?

Our core markets are Las Vegas, Phoenix, Salt Lake City, Denver, Boise, with broader regional coverage on request.

Energize your depot in 30 days.

Tell us your fleet electrification timeline. We will quantify the depot power you need and deploy it before the grid would even respond.

Get a Quote